A new approach based on real-time scheduling has been recently proposed for the management of electric loads composing a power system with the goal to reduce the peak load of power consumption. The novel idea is to model the power system in terms of timing parameters traditionally adopted in the field of real-time computing systems. In this way, the activation/deactivation of devices can be managed using classical scheduling algorithms developed for executing processing tasks in real-time systems. To prove the effectiveness of the proposed methodology, this paper shows its application to an industrial plant. Electric loads are modeled using timing parameters and a real-time scheduler is used to coordinate their activation. The coordinated management achieves the peak load reduction while meeting given constraints on the industrial process under control. The paper presents the modeling approach of the industrial process. The behavior of the control method is assessed by a simulated example.

Della Vedova, M. L., Facchinetti, T., Real-time scheduling for industrial load management, Paper, in 2012 IEEE International Energy Conference and Exhibition, ENERGYCON 2012, (Firenze, 09-12 September 2012), IEEE, New York 2012: 707-713. 10.1109/EnergyCon.2012.6348243 [http://hdl.handle.net/10807/60359]

Real-time scheduling for industrial load management

Della Vedova, Marco Luigi;
2012

Abstract

A new approach based on real-time scheduling has been recently proposed for the management of electric loads composing a power system with the goal to reduce the peak load of power consumption. The novel idea is to model the power system in terms of timing parameters traditionally adopted in the field of real-time computing systems. In this way, the activation/deactivation of devices can be managed using classical scheduling algorithms developed for executing processing tasks in real-time systems. To prove the effectiveness of the proposed methodology, this paper shows its application to an industrial plant. Electric loads are modeled using timing parameters and a real-time scheduler is used to coordinate their activation. The coordinated management achieves the peak load reduction while meeting given constraints on the industrial process under control. The paper presents the modeling approach of the industrial process. The behavior of the control method is assessed by a simulated example.
2012
Inglese
2012 IEEE International Energy Conference and Exhibition, ENERGYCON 2012
2012 IEEE International Energy Conference and Exhibition, ENERGYCON 201
Firenze
Paper
9-set-2012
12-set-2012
978-146731454-1
Della Vedova, M. L., Facchinetti, T., Real-time scheduling for industrial load management, Paper, in 2012 IEEE International Energy Conference and Exhibition, ENERGYCON 2012, (Firenze, 09-12 September 2012), IEEE, New York 2012: 707-713. 10.1109/EnergyCon.2012.6348243 [http://hdl.handle.net/10807/60359]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10807/60359
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 17
  • ???jsp.display-item.citation.isi??? ND
social impact